Al-Burj Cement Plant Project, Zliten

Zliten, LibyaCompleted1,400,000 tons annually

The production capacity of the Al-Burj Cement Plant is estimated at 1,400,000 tons annually. The plant operates on heavy fuel oil and can also be run on natural gas. The site was chosen in Zliten, close to the quarries in the Majer area, with a total area of 84 hectares, of which the first line occupies 59 hectares.

Al-Burj Cement Plant Project, Zliten
Industrial
Project Information

Client:

Arab Union Contracting Company aucc

Contractor:

FLSmidth

Main Consultant:

FLSmidth

Production Capacity:

1,400,000 tons annually

CEC's Role
Contracts Consultant
Project Status
Completed
Project Specifications

Production Capacity

1,400,000 tons annually

Total Area

84 hectares

First Line Area

59 hectares

Project Features
1
Annual production: 1,400,000 tons
2
Dual fuel operation (heavy fuel oil & natural gas)
3
Strategic location near Majer quarries
4
Modern industrial facility design
Key Project Highlights

High-capacity cement production facility

Flexible dual-fuel operation system

Strategic location near raw material sources

Modern industrial design and technology