Al-Burj Cement Plant Project, Zliten
Zliten, LibyaCompleted1,400,000 tons annually
The production capacity of the Al-Burj Cement Plant is estimated at 1,400,000 tons annually. The plant operates on heavy fuel oil and can also be run on natural gas. The site was chosen in Zliten, close to the quarries in the Majer area, with a total area of 84 hectares, of which the first line occupies 59 hectares.

Industrial
Project Information
Client:
Arab Union Contracting Company aucc
Contractor:
FLSmidth
Main Consultant:
FLSmidth
Production Capacity:
1,400,000 tons annually
CEC's Role
Contracts Consultant
Project Status
Completed
Project Specifications
Production Capacity
1,400,000 tons annually
Total Area
84 hectares
First Line Area
59 hectares
Project Features
1
Annual production: 1,400,000 tons2
Dual fuel operation (heavy fuel oil & natural gas)3
Strategic location near Majer quarries4
Modern industrial facility designKey Project Highlights
High-capacity cement production facility
Flexible dual-fuel operation system
Strategic location near raw material sources
Modern industrial design and technology